Quinquennial Report
(£85,000 - £101,000)
Generally
- A* Continued maintenance as recommended in appendix 8 of the Report.
URGENT & IMMEDIATE WORK
(£5,000 - £6,000)
- A* Carry out inspections listed in Schedule 6 and take the action recommended; report findings to Architect with special regard to opening up the suspect areas:
MECHANICAL SERVICESHeating SystemElectricsEnergy Audit with special reference to net zero carbon 2030.- Lightning Conductor
Fire Fighting Equipment & PlacingBell frame for security (note not used).
STRUCTURE- Monitor settlement cracks noted in the vestries, aisles, porch and clerestories for any further movement. 2022 - 2023 - 2024 - 2025 - 2026
- Monitor tower stonework for any further becoming loose – ensure public safety.
2022 - 2023 -2024 - 2025 - 2026 - Access & check the condition of the valleys over the nave by the tower, the south transept/organ & the vestry.
2022 - 2023 -2024 - 2025 - 2026 - Monitor general condition of leadwork and roof slating for defects especially to vestry and north transept. 2022 - 2023 - 2024 - 2025 - 2026
- Monitor for further fungal growth in the nave & north transept/vestry where the plaster has been removed.
2022 - 2023 -2024 - 2025 - 2026 - Check security of plaster to south aisle roof. 2022 - 2023 - 2024 - 2025 - 2026
- Maintain a check on the west porch roof. 2022 - 2023 - 2024 - 2025 - 2026
- Any closed spaces should be examined for decay when opened up for repair or maintenance especially the roofs. 2022 - 2023 - 2024 - 2025 - 2026
- Monitor boarded floors to nave and, aisles & transepts.
2022 - 2023- 2024 - 2025 - 2026 - Access & check the glazing to the west & east windows and the clerestories. 2022 - 2023 - 2024 - 2025 - 2026
- Carry out a disabled users needs audit.
- Fire safety check. 2022 - 2023 - 2024 - 2025 - 2026
- Carry out a general user safety audit.
- Arboricultural report on the churchyard trees
INSURANCECheck building insurance cover with E.I.G. via the Diocese.
- A Remove any loose stone on the base of the tower & north aisle for public safety. POINTING & STONEWORK
- B Reset eaves gutters to the south aisle, south transept & renew to the north aisle. POINTING & STONEWORK
- A* Clear all debris from roofs, valleys and gutters. POINTING & STONEWORK
- A* Clear all gullies and ensure drains free flowing. POINTING & STONEWORK
- A Check for & secure any further loose gable & clerestory wall flashings. POINTING & STONEWORK
- F Improve access up in to the tower chambers – for safety.
- B Repair and point the tower & west gable stonework include to renew damaged stonework. And, to the south aisle west and to the north transept east gable. POINTING & STONEWORK
- B*
Repair vehicular damage to boundary wall. - A* Clear all remaining debris and sundry stored materials from the bell, boiler and organ blower chambers and adjacent.
- F* Resolve ‘storage’ in the west porch with new fire proof cupboards.
WITHIN 18 MONTHS
(£50,000 – £55,000)
- B General stonework repairs, possibly in phases beginning with the tower to be followed with the nave west gable & south aisle. POINTING & STONEWORK
- F Renew the north east vestry valley gutter and lead work complete to improved design and to ease maintenance. POINTING & STONEWORK
- B Repair areas of defective plasterwork internally, renew where stripped after external repairs. POINTING & STONEWORK
- B Renew polycarbonate glazing protection to main windows & doors with ventilated scheme.
- B Local repairs to marble & mosaic work in the baptistry.
- A* Secure loose furnishings
- B General repairs to boundary walls.
- B Overhaul paths, locally relay.
- A* Overhaul external doors and repaint.
- F Implement recommendations of disabled and safety audits.
WITHIN QUINQUENNIUM
(£30,000 – £40,000)
- B Complete the stonework repairs and repointing. POINTING & STONEWORK
- B Reslate the north transept and renew under plastering. POINTING & STONEWORK
- F Further renewals to glazing and protection.
- B Redecoration following completion of repairs.
- F Consider alternative energy source.